Presidential Aide Sunday Dare condemns daytime roadworks after five-hour Lagos-Ibadan Expressway gridlock

November 19, 2026
7 views

The Special Adviser to President Bola Tinubu on Media and Communications, Sunday Dare, has sharply criticised the timing of ongoing construction work along the Lagos-Ibadan Expressway after enduring more than five hours in severe gridlock while travelling to Ibadan, Oyo State, on Wednesday, November 18, 2026.

​The massive traffic snarl was triggered by the recommencement of installation work on a pedestrian bridge around the Aseese corridor of the highway, which brought vehicular movement in both directions to a near standstill.

Thousands of motorists and commuters were left stranded along key stretches, including the Mowe and Magboro axes, forcing many travellers to abandon their vehicles and trek several kilometres to their destinations, while commercial motorcyclists reportedly hiked fares amid the chaos.

​Expressing his frustration in a Facebook post on Wednesday night, Dare questioned the decision of the Chinese contracting firm, CBC Construction Company, to execute the project during peak daytime hours rather than overnight.

He noted that it beat his imagination why a contractor would choose the busiest hours of vehicular traffic to construct a bridge and road around such a critical exit point, leaving cars stranded and thousands of people trekking home.

He further questioned why construction work was not carried out during late-night hours when traffic is lean, describing the situation as unnecessary pain that urgently needs to be corrected.

​Prior to the gridlock, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) had issued a public advisory announcing that the temporary traffic diversion would run for four days, beginning on Wednesday, November 18, and concluding on Sunday, November 22, 2026.

Speaking on the arrangement, TRACE spokesperson Babatunde Akinbiyi explained that the diversion was coordinated by the Federal Ministry of Works in collaboration with CBC Construction Company to facilitate the installation of the Aseese pedestrian bridge.

Akinbiyi had also assured the public that personnel from both TRACE and the Federal Road Safety Corps (FRSC) were deployed to the affected section to manage traffic flow and minimise travel delays.

​Despite those assurances, commuters endured gruelling standstill conditions throughout Wednesday afternoon and evening, with several motorists reporting that they spent up to eight hours navigating short distances between Mowe and Magboro.

The latest disruption compounds a series of recurring bottlenecks along the vital economic corridor, following closely on the heels of a 14-hour gridlock near Kara Bridge in September 2026 that was sparked by a multi-vehicle crash amidst ongoing repair works.

Don't Miss